Tub replacement: how do I get access to the plumbing below?
There is a bedroom behind it but it’s on the same level so I don’t think I’ll get low enough.
This is either directly above the corner in the kitchen or in the wall space between the kitchen and garage.
Do I just start cutting into the ceiling in the corner and hope it’s close enough? Put in the new tub plumbing and test it all then close it with drywall/plaster/paint?