Installing a sewage ejection pump. Does my set up make sense?
I am installing a sewage ejection pump in my basement with 3 planned items to drain into it. A half bath (toilet and sink) and a washer drain. There are existing vents roughed in above that I can tie into. This is currently just a dry fit and nothing has been glued yet. I know the toilet needs adequate space from the planned wall. Is there anything else I’m not considering? Any feedback would be greatly appreciated.